You ask, we build it. Missing a template? Request it in the Hall and back what we build next.
OneNote template

OneNote Project Management Template: Kanban, RACI and Risk Register

A kanban board, a portfolio tracker, a RACI, a risk register and a stakeholder map, built as OneNote pages you own outright. One purchase, no subscription, nothing to lay out.

$29.00
  • Windows, Mac, iPad, web
  • Instant digital download
  • Re-download any time from your account

What you’re getting

Drop-in OneNote

Sections, pages, and hyperlinks pre-built. Import once.

Cross-device sync

Works on Windows, Mac, iPad, and the web.

Pre-formatted templates

Headers, dividers, and link styles ready to use.

Instant download

OneNote package in your account immediately.

About this template

A kanban board, a portfolio tracker, a RACI, a risk register, a stakeholder map, milestones, a retrospective and a change log. Not a weekly planner with “project management” in the name: the artefacts a project actually runs on, built as OneNote pages.

The kanban is a tab, not a page buried inside something else. It is a five column table and cards move by cut and paste, because that is the only board mechanic that works the same on Windows, Mac, web and iPad. Nothing here needs an add-in and nothing breaks when you open it on a different device.

Twenty nine pages in four layers, plus a sticker set:

  • The portfolio. Portfolio, Portfolio review, Capacity. What is running, what is next, and whether anyone has the hours for it.
  • The board. Kanban, Backlog, Board rules.
  • The per-project pack, copied once per project. Project brief, Kickoff, Scope, Plan, Task breakdown, Status report, Retrospective, Close out.
  • The registers. Tasks, Done, Milestones, Timeline, Risks, Issues, Assumptions, People, RACI, Stakeholder map, Comms plan, Changes.

A Contents page and a tag system to hold it together, and a six page sticker set (banners and rules, plates and marks, progress bars, the tag set) so a page you have changed still looks like the rest of the book.

One purchase, and it stays yours. You download the notebook, it is yours, and there is nothing to renew.

Honest about what it is not: no page in this product calculates anything. It is a place to run a project, not a spreadsheet. If you want burndown arithmetic, this is the wrong file.

The notebook package installs in OneNote for Windows. Once it is installed and saved to OneDrive it opens and syncs on Mac, iPad, Android, phone and the web.

The rest of the OneNote line

We make six OneNote notebooks, each built for one job, and they sit side by side in the same notebook stack:

This one also comes in OneNote Templates for Work, together with the CRM, meeting notes, dashboard and calendar templates: five notebooks for less than buying them one at a time.

Tuned for OneNote

OneNote templates land as a ready-made notebook. Every section, every page, every hyperlink already built. Import once, then it syncs everywhere OneNote runs: Windows, Mac, web, and mobile.

№ · Bought together

Add the rest of the set.

Project Management This item · $29
All four, the full set $89 was $116

All four goes in as OneNote Templates for Work at $89, not four separate items. You keep $27.

№ · Questions

Common questions.

Which version of OneNote do I need?
The notebook package installs in OneNote for Windows. Once it is installed and saved to OneDrive it opens and syncs on Mac, iPad, Android, phone and the web, but it cannot be installed from a Mac or an iPad on its own.
How does the kanban board work in OneNote?
It is a five-column table on its own tab, and cards move by cut and paste. That is the one board mechanic that works the same on Windows, Mac, web and iPad, and it needs no add-in.
What does it include?
Twenty nine pages in four layers: a portfolio, a kanban board with backlog, a per-project pack (brief, kickoff, scope, plan, status report, retrospective, close out) and registers for tasks, milestones, risks, issues, RACI, stakeholders, comms and changes. Plus a contents page, a tag system and a six-page sticker set.
Does it calculate anything, like a burndown?
No. No page in it calculates. It is a place to run a project, not a spreadsheet.
When do I get the file, and is it a subscription?
Right after payment clears the download appears in your Templacity account, and we email a backup link. It is a one-time purchase with nothing to renew.
№ · Reviews

Be the first to say something.

Nobody has written about this one yet. If it is on your device, yours is the first thing the next person reads.

Read by a person before it goes up, usually within a day. Your email stays with us and never appears on the page.

Instant download.

Your file is in your account the moment you check out, yours to re-download any time. A receipt lands in your inbox, too.

One-time purchase.

No subscription, no annual renewal, no upgrade nags. Pay once and the file is yours.

Quiet, secure checkout.

Stripe. Apple Pay. No spam, no “partners,” no reselling your details. Receipt, file, done.